Zone Analysis
Give each permaculture zone a label, goals, constraints and notes, then assign the components you chose for the project to the zones they belong in, with a quantity, a unit, a spacing and a layout pattern. This page explains the three panels, the assign drawer and the report.
1. What it is
Zone Analysis is a page of its own for every project with Design unlocked. Zones are drawn on the site design canvas; this page is where you describe them and fill them. It works on the components already chosen for the project in the Site Design steps — plants, animals, structures, technologies and practices — and records, per zone, what goes where and how much. The Visualizer reads those assignments when it draws the site.
Part of Design
The page opens once Design is unlocked on the project. There is no separate purchase and nothing on it spends credits: assigning, editing and the report are free of charge.
2. Where to find it
Open a project with Design unlocked. In the Design menu choose Zone Analysis; the Design Hub shows the same page as the card Zone Analysis. The older Zone Components item next to it is a different tool: it asks the AI to propose components for one zone at a time, which you accept or reject. Zone Analysis assigns the components you already have.
The page header has two buttons: Refresh reloads the zones and assignments from the project, and View Report opens the report described in section 7.
3. Project zones
The Project Zones panel shows every zone of the project as a strip of tiles, one per zone, with its colour, number and label. Pick a tile and the pane below it opens that zone; the page remembers which zone you had open for this browser tab. The pane holds:
- Label — the zone's own name, such as Home or Community Kitchen. Press Edit Label, type, and save.
- Zone Properties — the area and the perimeter, measured from the drawn shape, in square metres and metres.
- Goals — pick from a catalogue with Add/Remove Goals. The catalogue depends on the zone number, so Zone 0 offers different goals from Zone 4.
- Constraints — free text, one per line, added with + Add Constraint and removed one at a time.
- Notes — anything else about this zone.
Label, goals, constraints and notes are stored when you press Save Zone Changes.
4. Picking a component
The Component Assignment panel lists the components chosen for the project as a grid of tiles with a picture, a name and a type. If the grid is empty, the project has no chosen components yet: add some in the Site Design steps, then come back.
- Search matches the name, the category and the zones a component is already in, so zone 2 finds everything assigned to Zone 2. Clear search resets it.
- Filter by category narrows the grid to one type.
- The grid shows a first page of tiles; Show more adds the rest.
- The grid is a keyboard list: arrow keys move, Enter picks the highlighted component for a zone.
- The small info button on a tile (View details) opens the component's own page of details and picture.
- A tile already assigned shows one in Zone N pill per zone; pressing a pill jumps to that zone in the Project Zones panel.
5. Assigning it to a zone
Picking a tile opens the assign drawer on the right. It names the component and asks for:
- Zone — preset to the zone open in the Project Zones panel; change it here.
- Quantity and Unit — both required, for example 12 plants or 40 m².
- Spacing (m) and Pattern — optional. The Visualizer uses them to place that many items in the zone, in that pattern, that far apart.
- Notes — optional.
Press Assign to zone. A toast confirms <name> assigned to <zone> with an Undo button for six seconds; the assignment is final only when the toast has gone. The same component can be assigned to several zones.
6. The Assignment Summary
The right-hand Assignment Summary lists every assignment of the project, grouped per zone, each group headed by the zone's number, label, item count and area. Pressing a group heading jumps to that zone. Above the list, a Type filter keeps one component type, and Sort orders the groups By zone, By name, By type or Newest first.
Each card has two buttons:
- Edit opens the Edit assignment dialog with the same fields as the drawer. Changing the zone, quantity, spacing or pattern clears the item's placement on the map; it is re-placed in the Visualizer on the next render.
- Remove asks you to confirm, then removes the assignment with the same six-second Undo.
7. The report
View Report opens the Zone Analysis Report for the project: one section per zone with its goals, its assigned components and its constraints, followed by a detailed list of the components. Copy to Clipboard copies it as text for an e-mail or a document; Print opens the browser's print dialog, which is also the way to save it as a PDF.
8. Good to know
- Two zones can carry the same number — two separate Zone 0 areas, say. The label tells them apart, and the summary, the pills and the report keep them separate.
- All measurements are metric: areas in m², perimeters and spacing in metres.
- Assignments belong to the zone. Deleting a zone on the site design canvas removes its assignments with it.
9. Where to go next
Design tools
Drawing the zones on the site design canvas, and the Zone Components tool that proposes what could go in them.
The Visualizer
Where the quantities, spacings and patterns you assign here become items standing on the rendered site.